Restoration works
A very long adventure that is just getting started...
Help us restore the Manoir de l'Aumônerie by clicking on the link below:
Fondation
The next major worksites...
The facades of the Saint Gorgon chapel, the base of the tower of the Logis...
2020-2022, Restoration of the burned down Pressor.
Within the framework of the Stéphane Bern Mission, thanks in particular to the organization of the "Mission Patrimoine" games of the Française des Jeux, the Fondation du Patrimoine has supported the safeguarding of the Pressoir du Manoir de l'Aumônerie (Ferme des templiers) in Saint Martin de Boscherville.
The construction site is also realized with the support of the DRAC of Normandy and our private and public Sponsors!
First phase of work : Carpentry, Masonry, Roofing.
Heritage Architect : Céline Berville.
Craftsmen : Carpentry by Desmonts SARL (27), Masonry by Renaissance du Patrimoine (76), Roofing by Demeilliers et Fils (76).
Second phase of work : Stairs, Woodwork, Electricity, Plumbing, Slab, Insulation, Painting
Heritage architect : Céline Berville.
Craftsmen : Woodwork by Desmonts SARL (27), Electricity by AJR2C (27), Plumbing by Philippe Dubuisson (76), Painting by LS Peinture (76), Slab by MESLIN (27), Insulation by DMCB (27).
2019-2020, Interior renovation and opening of the cottage the Longère
Craftsmen : Electricity by AJR2C (27), Plumbing by Philippe Dubuisson (76), Interior design by LS Peinture (76).
2019, Interior renovation and opening of the cottage the Crèmerie
Craftsmen : Electricity by AJR2C (27), Plumbing by Philippe Dubuisson (76), Interior design by LS Peinture (76).